Operational information
2026 Yard Rates & Accepted Materials
Review material requirements before arrival. All loads are inspected, and some materials require a clean-material declaration.
| Material type | 2026 rate | Public note |
|---|---|---|
| Asphalt (Clean) | $30 / tonne | Clean and uncontaminated; not mixed with other materials. |
| Clean Concrete | $25 / tonne | No rebar or debris; no larger than two feet in any direction. |
| Concrete (Light Rebar) | $55 / tonne | Minor steel only and manageable by crusher. |
| Wood Waste | $45 / tonne | Clean dimensional wood only; no garbage or plastics. |
| Stumps | $75 / tonne | Subject to size, dirt, and moisture content. |
| Waste Fill | $165 / box | No asphalt, organics, or debris. |
| Pit Run (Clean) | $5 / tonne | Sand, gravel, or screened dirt only. |
| Asphalt Shingles | $150 / tonne | Source-separated asphalt and fiberglass shingles. |
| Clean Hydrovac | $325 / load | Flat rate; clean-material declaration required. |
| Demo Waste | Coming Soon | Not currently listed for acceptance. |
On a small screen, swipe the table left and right to view all columns.
Oversized clean concrete: concrete larger than two feet in any direction is subject to a $40 / tonne sorting fee.
Before arrival
Accepted-Material Rules
- All materials are inspected upon arrival.
- Fill, hydrovac, and wood require a clean-material declaration.
- Clean concrete must be no larger than two feet and contain no fill, rebar, or other materials. Pure clean-concrete chunks larger than two feet in any direction are subject to a $40 / tonne sorting fee.
- Light-rebar concrete must be manageable by crusher and contain no garbage, plastic, or wood.
- Wood must be clean dimensional wood with no garbage or plastics.
- Stumps must be uncontaminated and free of soil and dirt.
- Clean pit run includes uncontaminated screened dirt, sand, and gravel with no organics or debris.
- Waste fill must be uncontaminated, contain no organics or debris, and requires screening.
- Shingles must be source-separated asphalt or fiberglass shingles.
- Clean hydrovac means hydro-excavation material only; no contaminants are tolerated.